Optimised material flow at Fresenius Kabi

Case Study Fresenius Kabi

Extended conveyor technology connecting three floors



When the healthcare company, Fresenius Kabi, decided to extend its German logistics centre and add a new floor to the existing building, it commissioned Kardex Mlog to install a new conveying system extending to all floors and areas. Through optimisation of the conveying lines and greater automation of the material flows, the company significantly increased throughput at the plant.

Download Referenz

Case Study Fresenius Kabi
Download

 
OK